Renovating a Johor Bahru condo: what to do first, and how to ask about the budget
Jayden Tay · REN 64148
2026-11-13
After handover of a Johor Bahru condo, many buyers want contractors in the next day. If the money has not been asked clearly and the drawings are not aligned, the job most easily turns into add-on charges as work goes along.
A steadier order is this: first deal with handover defects, then get written approval from the management office, check whether the contractor is registered with the Construction Industry Development Board (CIDB), then use the same scope to ask several firms for quotations. How the budget is set should be compared on written quotations, not by first fixing in your mind a “price per square foot”. That unit price online has no official price list. Unit size, whether the pipes have to be changed, and the grade of materials differ widely. This article will not estimate a figure.
Another article on this site has already written the rules for checking CIDB and applying to the management office; see Renovating a new home: check the contractor, ask about approvals, then split the budget. What this article adds is this stretch for a Johor Bahru condo: in what order to do it, and how to get the budget asked clearly. The kitchen and bathroom most easily go wrong; you can also see Kitchen and bathroom renovation: the pitfalls people hit most often. If a landed home is to be extended, you may also have to ask the council; see Renovating or extending a landed home: ask the council first whether approval is needed.
Why, if the order is wrong, you will be passive later
For example: someone, the day after handover, asks a worker to break up the bathroom floor tiles, hoping to redo them before moving in. After the tiles are taken up, they find that the original waterproofing or drainage already had a problem. The developer’s defect period is still running, but the site has already been opened up, and responsibility becomes hard to separate. On the management-office side, written approval has not yet come down, waste is already piled in the corridor, the works may be stopped, and the deposit may not be refunded smoothly.
So it is not “start work first and make up the paperwork later”, but first write the defects, the approval and the quotation clearly, then decide which day to start on site. Until these three steps are done, do not first take out kitchen cabinets, do not first break a bathroom wall, and do not first pay a large booking sum to a contractor whose registration has not yet been checked.
I suggest you do it in this order
- First go through the defect record from handover once. If it is still within the defect period, first report the repairs under the developer’s procedure, then decide which items belong to the renovation you will do yourself. Once pipes, wiring and waterproofing have been removed or covered over, responsibility becomes hard to separate. For the time limits on handover and defect reports, see Handover and defect repairs: confirm the start date first.
- Ask this condo’s management office for the renovation rules, and apply for written approval. The 2015 strata management regulations provide that, before renovating a strata unit, you must first obtain written approval from the management office, and where necessary also the approval of the competent authority; the management office may collect a renovation deposit and set a completion time. The works may only be done inside your own unit, must not weaken the building structure, and waste must not be left in a common place. A commencement letter from the management office cannot take the place of the approval the competent authority has to give.
- Ask clearly how much the deposit is, how it is refunded, which days and hours works are allowed, how materials are brought in, and which route waste is cleared by. This deposit has to be set aside separately. Do not count it into the contractor’s quotation and think everything has been paid. The amount differs from block to block. There is no nationwide single standard. Follow the management office’s writing.
- Then ask the contractor for the company’s full name and CIDB registration number, and check on CIDB’s public search system whether the status, validity, grade and category cover this job. The search method and the points to watch are already written in the renovation article, and the steps are not repeated here.
- Write a scope note, and ask at least two or three firms to quote on the same scope. When the quotations have been matched completely, then sign the contract, pay the booking sum, and fix the start date.
How to ask about the budget so that you can actually compare
A more practical way is first to write clearly which rooms will be done, whether kitchen or bathroom pipes and floor tiles will be changed, whether a wall will be taken down, who is responsible for clearing, what specification of materials will be used, how long the works will take, in how many stages payment is made, and how mid-job additions are confirmed in writing. Then send the same scope to several firms, rather than letting each guess what you want.
When the quotations come back, do not only look at the last total. Some quotations look low because waterproofing, clearing or the electrical box is not inside. You can treat the table below as a comparison checklist. Where something is missing, ask the other party to add a written note, then compare the totals.
| Comparison item | Is it written clearly in the quotation |
|---|---|
| Which rooms and which works are in scope | |
| The scope, height and warranty of kitchen and bathroom waterproofing | |
| Who is responsible for water pipes, waste pipes and wiring, and whether the management office has to be notified separately | |
| Whether demolition, clearing and waste are included in the quotation | |
| Material specifications, or only “to be charged separately” | |
| The duration, and the hours the management office allows for works | |
| How the booking sum, interim payments and the final payment after inspection are split | |
| If an existing problem is found after work starts, how a written variation is added | |
| Whether the management office’s renovation deposit has already been set aside separately |
There is no official “Johor Bahru condo price per square foot”. In the same block, only changing kitchen cabinets, and redoing the whole unit including kitchen and bathroom, will give figures that differ widely. Multiplying the square footage by a unit price you have heard will, in the end, mostly fail to match a written quotation.
A few sentences you can read out when you ask for a quotation
- “Please quote on this scope. Do not add or remove items on your own. If something is not included, please write it out item by item.”
- “To which layer is the kitchen and bathroom waterproofing done? If it leaks to the unit below or next door, how is the warranty calculated?”
- “Are demolition and clearing included? Can waste be placed in the corridor temporarily?”
- “How many days is the duration, and what hours does the management office allow for works?”
- “How much is the booking sum, when are interim payments made, and the final payment only after inspection on completion — how can this be written into the contract?”
Common misunderstandings
“Start work first; the approval can be made up later.” The management office can stop the works. The deposit and neighbourly relations will both be affected. What the regulations require is obtaining written approval first.
“The firm with the lowest quotation is the best value.” First look at whether the scope is complete, especially waterproofing, clearing and electrical work.
“Multiply the square footage by a market price, and you can set the budget.” There is no official unit price. The budget should be set from written quotations on the same scope.
“Once you have paid the contractor, you do not have to set aside a management-office deposit as well.” The deposit is a separate sum. How it is refunded follows the management office’s writing.
“If the management office has approved it, it means anything can be changed.” The structure must not be weakened. Changing water pipes, waste pipes or an external wall often has further limits. See the kitchen-and-bathroom article for the details.
What to do next
First have the defect record and the management office’s renovation rules in hand, then write the scope, check CIDB, and ask for quotations. When three quotations have been matched completely, then decide which firm, and which day, will start on site. If the kitchen or bathroom will touch waterproofing or pipes, write the scope in more detail. Do not let the five words “kitchen renovation” stand in for it.
You can close it this way: For renovating a Johor Bahru condo, first report defects, then get written approval, then check the contractor, and finally compare quotations on the same scope. Do not set the budget by a “price per square foot”, and do not first break up the bathroom before approval is given. Writing the scope clearly, and putting missing items into writing, makes add-on charges less likely than first paying a large booking sum.
The above is general information, not engineering or legal advice. Approvals, deposits and the contract follow the management office, the competent authority and the renovation contract you sign.
Source
- Strata Management (Maintenance and Management) Regulations 2015 (Third Schedule: renovation requires written approval, a deposit, works limited to the interior of the unit, the structure must not be weakened, waste must not be dumped in a common place)
- CIDB contractor registration (checked in the citation of the existing renovation draft; contractors generally have to be registered, and the works must not go beyond the registered grade and category)
- This site: Renovating a new home: check the contractor, ask about approvals, then split the budget (CIDB search steps and a method for splitting the budget)
Related reading
- How to furnish a condo: common styles, and where in Johor Bahru to buy furniture
- Buying furniture in Johor Bahru: IKEA Tebrau or a mall? It depends on what you need
Was this article helpful?