Kitchen and bathroom renovation: the pitfalls people hit most often
Jayden Tay · REN 64148
2026-11-13
After a condo is handed over, many people start with the kitchen and bathroom. Both have water, and both sit close to the ceiling of the unit below. Get them wrong once, and the repair is much more troublesome than changing the living room.
The usual problem is not that “the materials do not look good enough”. It is changing the pipes before you have written approval from the management, a quotation that does not say how far the waterproofing goes, getting someone without the right qualification to connect the wiring as they please, and covering up defects that are still within the defect-liability period. So before you touch the kitchen or bathroom, do three things first: the written approval should state what can be changed, the quotation should write the waterproofing, pipes, tiles, electrical work and debris removal as sentences, and any seepage or drainage problem already there at handover should be reported for repair before you demolish anything.
For the order of a Johor Bahru condo renovation and how to ask about the budget, first see Renovating a Johor Bahru condo: what to do first, and how to ask about the budget. For checking the contractor and the time limit for reporting defects, see Renovating a new home: check the contractor, ask about approvals, then split the budget and Handover and defect repairs: confirm the start date first respectively. This article does not list “roughly how much a kitchen or bathroom costs”. That kind of cost varies widely, and you should ask contractors for a written quotation against the same scope.
A common situation that gets away from you
For example: after handover, someone feels the bathroom floor tiles do not look good, and asks someone to hack them out and relay them. The quotation only writes a single total for “redo the bathroom”. A few weeks after the work is done, water stains appear on the ceiling below. Only then do they find that the quotation did not say which surfaces would be waterproofed, to what height, how long the warranty was, or who would be responsible if it leaked to the unit below. The management steps in, and the developer may also say the site has already been demolished, so responsibility for the original defects cannot be separated. The money to repair it, compensation for the unit below, and the relationship with the neighbours, will all cost more than writing the waterproofing as sentences in the first place.
So a kitchen and bathroom renovation is not about choosing the colour of the tiles first. It is about writing the responsibility for water and electricity on paper, then starting work.
Do not touch the pipes or the soil stack before you have approval
Changing the position of the kitchen or bathroom pipes or the soil stack in a strata unit, or altering external doors and windows, is usually more restricted than only changing the kitchen cabinets. The 2015 Strata Management (Maintenance and Management) Regulations state that renovation must first obtain the management’s written approval, the works must not weaken the building structure, and debris must not be left in common areas. Moving pipes or the soil stack, or rewiring as a whole, often has further approval limits. This is the step many buyers skip, and they only find out when the management tells them to stop.
On site, you can first ask the management: “Changing the position of the kitchen sink, changing the position of the shower, hacking the bathroom floor tiles and redoing the waterproofing — does this job need extra approval? Which parts absolutely cannot be touched?” If they say “a small job does not need approval”, ask them to write it into the approval letter or the renovation rules, and do not rely only on a spoken word.
What you can do inside your own unit also does not mean you can occupy the corridor to stack tiles, discharge dirty water into the air well of the unit below, or hack stone outside the hours the management has set. These are usually written in that block’s renovation rules; get a copy before you go in.
Waterproofing and warranty have to be written as sentences in the quotation
What kitchens and bathrooms fear most is seepage downwards after the work is done. This article could not find an official “waterproofing unit price” or a mandatory method list that applies to every condo, so it does not prescribe here which material you must use, or how many layers.
A more practical approach is to write these sentences clearly in the quotation and the contract:
- Which floors and walls will be waterproofed, and to what height
- Which system will be used, who will carry out the work, and how it will be inspected
- How long the warranty is, and from which date it starts
- If it leaks to the unit below or next door, how it will be handled, and who bears the cost
If you hack the floor tiles before this is written, it is hard to pursue later. If at handover the bathroom or kitchen already has seepage, hollow tiles or poor drainage, report it first under the defect record, and only then decide whether to redo it yourself. If you demolish first and report later, the developer may say the responsibility cannot be separated.
You can also ask to see the waterproofing layer once before the tiles are laid, and keep photographs. If you only inspect after everything is covered, you can only see the surface.
Do not connect the wiring casually
When changing a kitchen, people often add sockets, a cooker hood and a dishwasher; a bathroom may add an exhaust fan or a water heater. These are not as simple as “just running an extra cable”. A full rewire or a change to the consumer unit may have further limits from the management and the authorities, and needs to be done by a qualified electrician. Before work starts, ask the contractor for the qualifications of the person responsible for the electrical part, and ask the management whether this block has extra requirements for changing the electrics.
Do not, without a written scope, let someone bury cables inside a wet-area wall. When it later needs repair, the wall has to be opened again, and both the cost and the disruption will be larger. The position of the water heater, the exhaust and the power supply should also be agreed with the contractor before they go in; do not change the position halfway through the job.
A few lines to take to the contractor and the management
- “Which pipes, soil outlets and exhaust positions can be changed, and which cannot be touched?”
- “Please write the waterproofing scope, height, materials and warranty for the bathroom and kitchen into the quotation.”
- “Who is responsible for the electrics and the water heater? Please provide the relevant qualifications, and say whether this has to be separately reported to the management.”
- “What does the management say about the hours, and the route, for hacking stone, bringing in materials and stacking them?”
- “If after work starts you find a problem with the existing pipes or waterproofing, how will a written variation be done, rather than adding money by word of mouth?”
Common misunderstandings
“We are only changing the floor tiles, so there is no need to redo the waterproofing.” After the old tiles are hacked out, the existing waterproofing layer has often already been damaged; if this is not written clearly in the quotation, it is hard to make good later.
“A leak is the contractor’s business; a spoken warranty is enough.” Write the scope, the period, and how a leak to the unit below will be handled.
“Renovate first after handover, and go to the developer if there is a problem.” If you demolish first and report later, responsibility becomes very hard to separate.
“The renovation contractor can just connect the wiring while they are at it.” For a change to the consumer unit or wiring in a wet area, ask clearly that it be done by a qualified person, and confirm whether it has to be separately reported to the management.
“The management said it was all right by word of mouth, so that counts as approval.” Ask for it to be written into the approval letter.
What to do next
First confirm with the management what can be changed in this kitchen and bathroom job, and whether extra approval is needed; then write the waterproofing, pipes, electrics and debris removal into the same scope, and ask at least two contractors to quote against that scope. If handover defects have not yet been reported, report them for repair before you demolish anything. Keep photographs of the waterproofing inspection before the tiles are laid.
A way to close it: What kitchens and bathrooms fear most is not that they do not look good, but water seeping downwards, wiring connected as people please, and approval not obtained. First write what can be changed into an approval, write the waterproofing and warranty as sentences, report existing defects for repair, and then start work. A quotation that only writes a single total, or hacking the floor tiles before approval, usually costs more to put right later.
The above is general information, not engineering or legal advice. What can be changed, and how inspection is done, follows the management’s approval, the requirements of the relevant authorities, and the renovation contract you sign.
Source
- Strata Management (Maintenance and Management) Regulations 2015 (Third Schedule: written approval, must not weaken the structure, restrictions on debris; changing pipes, the soil stack and wiring also needs attention to the scope of approval)
- This site: Renovating a Johor Bahru condo: what to do first, and how to ask about the budget (order, asking for quotes against the same scope; costs follow the written quotation)
- This site: Handover and defect repairs: confirm the start date first (report for repair before renovating, so that responsibility does not become hard to separate)