Renovating a new home: check the contractor, ask about approvals, then split the budget
Jayden Tay · REN 64148
2026-11-07 · 2026-11-16
Once they have the keys, many clients rush to find a renovation contractor. I usually suggest doing three things first: check the contractor, ask about approvals, and split the budget. Get the order right and you’ll save yourself a lot of trouble later.
This article focuses on Johor. Check any extra local-council by-laws or project-specific house rules with the management office. If you plan to extend a landed home, you may also need to apply to the council; see Renovating or extending a landed home: ask the council first whether approval is needed.
Split the budget into three parts first
Every home is different. A bare unit and a fully fitted one, or keeping the original layout versus redoing the plumbing, cost wildly different amounts, so I won’t give a “per square foot” figure here.
A better approach is to split the budget into three: what must be done before you move in, what makes sense to plan together, and what can be added later. This is just a way to organise your thinking, not a fixed order of works.
Check the contractor: are they registered with CIDB?
In Malaysia, a contractor doing construction work generally has to be registered with the Construction Industry Development Board (CIDB), unless the law exempts them. If the registration has lapsed, or the job is beyond their registered grade and category, they can’t take it on.
Here’s how to check. Ask for the full name of the company that will sign the contract, plus its CIDB registration certificate and number. Then use CIDB’s CIMS public search to check the name, status, validity, grade and category, and whether they cover this kind of work.
If the search site won’t load, that doesn’t tell you whether the contractor is qualified or not. Try another day, or ask for a copy of the certificate. Being registered is no guarantee of good work, either — you still need to look at the quotation, the contract and past jobs.
This article hasn’t searched for or recommended any contractor.
Living in an apartment? Get the management office’s approval first
If you’ve bought strata property (an apartment, condo and so on), you need the management office’s written approval before renovating, and where required, approval from the relevant authority too. Checking that the authority’s approval is in place is the owner’s own responsibility; a commencement letter from the management office doesn’t replace it.
The management office can ask for a renovation deposit and set a completion deadline. Amounts vary from place to place, and there’s no nationwide standard. Work must stay inside your own unit, must not weaken the building structure, and debris can’t be left in common areas. Moving external doors and windows, relocating water and soil pipes, or rewiring the whole unit come with further approval restrictions, so ask first.
Quotations: only comparable if based on the same drawings
Get several contractors to quote on the same drawings and scope, then ask:
- Are hacking and debris disposal included?
- What material specifications are used?
- How long will the works take? How many payment stages are there?
- If work is added midway, how will it be confirmed in writing?
CIDB has a standard contract for small works, which can be used together with the drawings and specifications. Not every job has to use it, and using it doesn’t guarantee there will be no disputes.
Before work starts
Check against your defect list from vacant possession, and report anything not yet fixed first; see Handover and defect repairs: confirm the start date first. Before wiring, plumbing and waterproofing are covered up, have a suitable professional inspect them. For how much money you need overall, see How much money do you really need to buy a new home?
Interior designer or straight to a contractor?
| Your situation | Better fit |
|---|---|
| You want to change the layout, have lots of built-in cabinets, and want a coherent style | An interior design firm. Ask about the design fee and the construction fee separately |
| You only want the basics: curtains, lights, kitchen cabinets, a water heater | Go straight to a contractor or individual tradespeople |
| You’re not in Johor Bahru and can’t visit often | A firm that handles both design and construction, with the contract spelling out who is responsible and how inspection and handover work |
Whichever you choose, the company actually doing the work must have its CIDB registration checked, and you still need the management office’s approval.
For payment, a common approach is to pay in stages as the work progresses. Don’t pay most of it upfront. Keeping the final payment until the work is finished and you’ve inspected and accepted it gives you more protection. Write the number of stages and the amount of each into the contract.
Next step: in the week you get the keys, collect the renovation rules and application form from the management office, then arrange for two or three firms to quote on the same drawings.
This is general information, not engineering or legal advice. Approvals and contract terms are whatever the management office, the relevant authority and your signed renovation contract say.
Source
- CIDB contractor registration (registration requirements, exemptions, grades and categories; the standard contract for small works)
- CIDB frequently asked questions for owners (searching contractor particulars)
- Strata Management Regulations 2015 (Third Schedule: renovation approval, deposits, restrictions on works)
Related reading
- Renovating a Johor Bahru condo: what to do first, and how to ask about the budget
- Before you pay the renovation final sum: how to inspect, and how to keep evidence if there is a dispute
- How to fund a renovation: cash, personal loans and home-related financing