Renovating or extending a landed home: ask the council first whether approval is needed

Jayden Tay · REN 64148

2026-11-13

If a landed home is to be extended, enlarged, structurally altered or have its use changed, it is usually not enough only to find a familiar contractor and start work. Many works first have to apply for building plans from the city hall or district council of the place, and go through that authority’s one-stop centre (OSC). Starting to demolish or build without approval may later face enforcement, a fine, or a requirement on resale to restore the original state.

This site’s What to do first when renovating a new home has already written: a contractor generally has to be checked for CIDB registration, and a condo also first has to obtain the management’s written approval. That article still applies. This article adds the landed-home stretch — besides whether the contractor is qualified, you also have to ask whether the local authority approves it. The “one-stop centre” here is the official system name the Ministry of Housing and Local Government gives local authorities nationwide.

Why you should ask the city hall first

Whether a house and an extension are lawful mainly depends on the local authority approving them under the street, drainage and building law then in force, the Uniform Building By-Laws, and that authority’s own planning and building-plan procedures. The Ministry of Housing and Local Government (KPKT) provides the OSC 3 Plus online application system for local authorities nationwide, which includes applications such as “building plans (addition / alteration)”. In other words, adding to or altering a building plan often means going through this OSC line, rather than only saying something verbally on site.

This article does not list a nationwide uniform checklist of “whether changing a cupboard needs approval, or whether adding a porch needs approval”, because each city hall’s definition of minor works is not entirely the same, and official forms and fees are also updated. A safer approach is: write the scope you intend to do as a simple note, together with the title and existing building plans (if any), and first ask the building or OSC counter of the local authority (PBT) of the place, and let them tell you whether plans have to be submitted this time, which documents are needed, what the fees are, and how long it takes.

These can be prepared before work starts

  1. The title or the latest title particulars, confirming that you are the owner, or that you already have the owner’s written authorisation.
  2. What you intend to change: only interior renovation, or involving structure, enlarging the built-up area, changing the roof, changing the use, or affecting a neighbour or public drainage.
  3. The contractor’s full company name and CIDB registration; how to check is in this site’s renovation article.
  4. If the house is still under a home loan, first ask the bank whether there is any additional requirement for an extension or a structural alteration.
  5. How construction waste will be cleared, and whether it will occupy the road or a public drain, are also often in the city hall’s rules. Do not wait until a complaint is made before dealing with them.

If the OSC portal online cannot be opened or requires a login, going directly to that PBT’s OSC counter or official website to enquire is also fine. Before approval is down, do not first demolish a load-bearing wall, lay foundations or change an external wall to a degree that cannot be restored.

Do not use the same approach for a condo and a landed home

The external walls, structure and common areas of a strata condo belong to the management and the by-laws. Even if the unit is in your name, that does not mean you can add a balcony or change the façade on your own. A landed home does not have this layer of management, but it has the extra layer of the city hall and planning. Both sets of rules have to be asked; only the window is different.

If a new home is still in the defect liability period, first report repairs according to the defect record at handover, then decide which items are renovations you will do yourself. Changing first and reporting defects later makes responsibility hard to separate. Handover defect reporting is covered in Handover and defect repairs: confirm the start date first.

General information only; this is not legal advice. Whether plans have to be submitted, the fees and the time limit follow the reply of the city hall of the place at the time.