What to inspect on the day you collect the keys: a handover checklist

Jayden Tay · REN 64148

2026-11-13

When the handover notice arrives, many people first book leave to collect the keys, and only then think about what they should actually look at. Getting the keys does not mean the home has no problems, and it does not mean the defect period has not already started.

I will first say how I would do it. First look at the date on the notice, and work out which day is 30 days later, because the statutory standard agreement states that 30 days after the notice is issued, even if you have not yet gone to collect, and have not yet moved in, you may be treated as having already received vacant possession. If you are in Singapore or elsewhere, all the more reason not to leave the notice sitting. When you get to the site, first match the certificate of completion and compliance (CCC), whether water and electricity can be connected, and whether the keys and access cards are complete, then do a room-by-room inspection of what you can see and touch. If there is a problem, write it down one item per line, and notify the developer in writing in the manner provided in the agreement.

How the defect period is counted, and what to do if it is not repaired within 30 days, is already written in Handover and defect repairs: confirm the start date first. For how late-handover compensation is calculated, see New home handed over late? How to work out LAD compensation. This article only adds one thing: on the day you collect the keys, which places you actually have to look at.

Before you go in, first match these documents

Under Schedule H, handover usually requires a certificate of completion and compliance, and water and electricity that can be connected to the unit. If the strata title has not yet been issued, the developer must have written confirmation from the Controller of Housing before it can hand over within the period. When you get to the site, ask the developer or the management office for copies of these documents, and write down the water and electricity meter readings, the keys and access cards, the parking-bay number and the letterbox key.

Also keep the notice, the agreement and the defect-reporting channel together. Do not first sign a form you do not understand that says “everything has been accepted” or that waives rights. WhatsApp can be used to communicate, but do not assume it can definitely take the place of the written notice provided in the agreement.

The first inspection should only be of what you can see within a safe range. Do not open the electrical box yourself, connect wiring, or shake a railing hard, and do not run a pressure test with water without asking first. If you see exposed wiring, a railing that is clearly unstable, or a serious leak, stop first and ask a qualified person to deal with it.

Walk room by room, one item per line

The checklist below is a site record for buyers themselves. It is not a report from an inspection firm, and it does not guarantee that every hidden problem can be found. For each item, note the location, the problem, the photograph number and the date it was found.

The entrance and the passage. Whether the main door, the security door or the grille opens and closes smoothly and can be locked; whether the door frame has an obvious crack or will not close tightly; whether the corridor or stairs have damage.

The hall and the rooms. Whether the walls or ceiling have an obvious crack or a trace of seepage; whether floor tiles or timber flooring have an obvious hollow, a broken corner or a serious colour difference; whether windows can be opened and closed, and whether the drainage holes are clear; whether there is a trace of seepage around the window frame.

The kitchen. Whether the sink or the tap has an obvious drip; whether cabinet doors can be opened and closed; whether tiles and wall corners have an obvious hollow or damage; whether the extract-duct opening has already been left. Do not connect electricity or change pipes on your own.

The bathroom and the balcony. By eye, whether the wall-floor junction or the ceiling has a trace of seepage or mould; whether the drain is obviously blocked; whether the door and the threshold can close. Do not treat the whole bathroom as a state that can be closed up and renovated at once. If seepage has not been checked clearly, do not first close the ceiling or cover the floor.

Power and fixtures. Only check the switches, socket covers, light points, doorbell and air-cond points that you can see, and whether they are complete and without obvious damage. Do not open the electrical-box cover and test the electricity yourself.

Railings and outside the window. Only do it by eye: whether a railing is obviously loose or rusted, and whether the glass is cracked. Do not push hard or climb.

Outside the door and ancillary space. Whether the parking-bay number, store room, letterbox and the path to the bin room match the agreement or the attachments. If the area has to be checked again, write down in square feet the approximate range you actually measured, then go back and match it with the agreement.

Common areas may not all be able to be looked at on the same day, but what is obviously unfinished and cannot be used safely should also be photographed and noted, and you should ask clearly whether the responsibility belongs to the developer or the management office.

After the day is over, do not leave the checklist only in the phone album

On the same day after you get home, organise the photographs and the text into a defect list, send it to the person and in the manner stated in the agreement, and keep a copy yourself. Time is still being counted from the date you received vacant possession, or were treated as having received it. The defect liability period in Schedules G and H is generally 24 calendar months after receipt. After written notice, the developer usually has to repair at its own cost, within 30 days, problems that belong to workmanship, materials, or a departure from the approved plans.

Whether to ask someone else to inspect can be looked at in the comparison table in the handover article. An inspection report cannot take the place of the written notice provided in the agreement. This site does not recommend any inspection firm.

Before renovation, a condo first has to get written approval from the management office. If seepage has not been checked clearly, do not rush to close it up. For how to prepare a renovation, see Renovating a new home: check the contractor, ask about approvals, then split the budget.

How I would arrange this day

Your situationMy suggestion
You are in Singapore, and it is usually hard to take leaveOnce the notice arrives, fix a date, and try to go within 30 days. If you have no time to look carefully, you can consider asking someone to help, but you still have to read the report yourself and then issue it under the agreement
You will live there yourself, and the unit is not largeUse the checklist above, take a torch, a measuring tape and a phone, and walk through slowly
You have already seen seepage or an obvious crack, or it is a landed homeAsk a qualified person to look. That is better than guessing yourself
The developer is pressing you to sign “no defects” on the same dayDo not sign. First complete the inspection and the written notice

Common misunderstandings

“Time only starts when I collect the keys.” Not necessarily. Thirty days after the notice is issued, even if you have not yet gone, you may be treated as having already received vacant possession, and later responsibilities such as the defect period and assessment tax may also start to run.

“I told sales on site, so that equals having reported the defect.” You have to notify in the written manner provided in the agreement, and keep a copy.

“If there is a defect, I can first withhold payment.” The agreement treats payment and defects separately. Do not withhold money that is due yourself. Ask a lawyer first.

“A checklist can find every problem.” Hidden pipe and wiring problems may not be visible on the day. So within the 24-month defect period, you still have to look again and report again.

What to do next

  1. Mark the date on the notice, work out the last of the 30 days, and fix the time to view the home.
  2. Bring the agreement attachments, the checklist, a torch, a measuring tape and a phone. First match the documents and the meters, then inspect room by room.
  3. On the same day or the next, issue the defect list in the manner of the agreement, and keep a copy.
  4. Write the 30-day repair period and the 24-month defect expiry date into the calendar.
  5. Treat renovation approval and defect-repair progress separately. Do not sign them away on the same “already accepted” form.

You can close it this way: The day you collect the keys is not for taking photographs as a souvenir. It is to confirm that the home can be handed over, that the problems have been written down, and that you yourself are clear about the date time starts to run. Match the documents first, then look room by room, and after you have looked, you must give written notice.

The above is general information, not an inspection report or legal advice. Handover conditions and the defect-reporting procedure follow your agreement and your lawyer’s explanation.