How to walk from the RTS station at Bukit Chagar, and how long the walk takes
Jayden Tay · REN 64148
2026-11-13
The Malaysia station of the RTS Link is at Bukit Chagar in Johor Bahru; the Singapore station is at Woodlands North. People viewing a home often ask how to walk after leaving the station, and how long it takes. This article only writes how to walk from the station and the public connections. It does not list any condo or project, and it does not confirm “a walk of so many minutes” for any project. What to check when you buy a unit “near the RTS” is already written in Buying a home near the RTS: what to check in practice. For how to break down a door-to-door commute, see Working in Singapore, buying in Johor Bahru: work out the door-to-door commute first.
First remember two facts. First, at the time of checking, passenger service had not yet started. A joint announcement in October 2026 by Malaysia’s Ministry of Transport and Singapore’s Land Transport Authority stated that the operating company had informed both sides that the target was to start passenger service in February 2027, still subject to independent safety certification and final regulatory approval. A target is not already open. On fares and the formal opening date, the Transport Minister told CNA in August 2026 that they would be jointly announced by both countries later. This article does not write rumoured fares. Second, the RTS immigration facilities at Bukit Chagar are not the same system as the existing land checkpoint at Bangunan Sultan Iskandar (BSI). The design after opening is that clearance for both sides is completed at the departing end, and you do not have to queue again on arrival. Do not take the present queue time at BSI directly as the time it will take to leave the RTS station later.
After you leave the station, how official sources and reports say you connect
According to a CNA report of 18 August 2026 on the Transport Minister’s site visit, between Bukit Chagar station and JB Sentral there is a covered pedestrian bridge of about 450 metres, with a travelator. The report wrote that other connections to the taxi stand, buses, KOMTAR JBCC and JB Sentral were planned to be ready when RTS operations began; the operating target was then said to be early 2027, and later the February 2027 target in the October joint announcement should be followed. The same report also wrote that the bridge would connect to a planned bus turnaround in the Jalan Jim Quee area and, further on, to the taxi stand.
The report also wrote that another pedestrian connection, closer to the KTM station and able to reduce walking back on yourself, was then expected to take about another twelve months to be built. That is to say, if passenger service starts on the target, KTM passengers may for a period still have to walk first into JB Sentral, then connect to this bridge. Do not treat “a direct connection to the KTM platform” as a condition that will definitely be there on the first day of opening. Construction progress follows what the authorities publish at the time.
How long the 450-metre covered walkway actually takes to walk depends on the crowds, luggage, whether the travelator is used, and which entrance is open that day. This article does not write it as “five minutes in every case”. After it opens, follow the wayfinding in the station and the time of walking it yourself. The station is not yet open to the public for passenger service, and you should also not treat a temporary hoarding route beside the works as the later fixed way of walking.
Public nodes you can already use to find your way now
To get a feel of “how much farther you still have to walk after leaving the transport hub”, you can start now from public places that are already open, rather than memorising the advertised distance of any project.
- JB Sentral: the hub for KTM, long-distance buses and city connections. After opening, the covered bridge in the reports is one of the main ways of walking towards here. You can first, from a Sentral entrance, walk the existing covered pedestrian bridge that leads towards city malls, and feel how long this stretch takes with luggage.
- Bangunan Sultan Iskandar (BSI): the existing land checkpoint. It is in the same area, but clearance is not the same queue as at the RTS station. Before opening, crossing still goes through BSI. After opening, if you are taking the RTS, do not walk the wrong way onto the BSI pedestrian route.
- The Jalan Jim Quee area: the bus and taxi connections in the reports are planned on this road. Whether private vehicles and e-hailing will later be allowed to pick up in this area follows the authorities’ traffic controls at opening. Do not assume a car will definitely be able to stop at the station entrance.
- The city’s covered pedestrian system: the existing bridges from the JB Sentral area towards nearby malls can be walked now. This stretch will connect with the future bridge out of the RTS station, but the finished surface and wayfinding will follow what is in place at opening.
When it is raining, at the evening peak, and when you have a lot of luggage, walking the public stretches above once is more useful than measuring a straight line on a map. Between the station and the door of the unit you are viewing, there may still be a road to cross, works, or an unfinished connection. You must yourself time the walk from that unit’s entrance to the public stop. This site does not give a walking promise for any project.
Also leave a backup route: when the train has not yet opened, when the service is suspended, or when the last train has gone, crossing may still have to go through the existing land checkpoint. For how to combine driving, the bus and e-hailing in the city, see Getting around in Johor Bahru: how to choose between driving, the bus, Grab and the RTS.
Common misunderstandings
“The advertisement writes a five-minute walk, so you do not have to walk it yourself.” That often does not say clearly from which door it is measured to which entrance, and this site also does not confirm it for a project.
“After leaving the RTS station you still have to queue again at Malaysian immigration.” The design is that clearance for both sides is completed at the departure station. Follow the authorities’ arrangements after opening.
“The direct KTM connection will definitely be finished on the first day of opening.” The August 2026 report stated that the closer KTM connection then still needed about twelve months.
You can close it this way: After leaving Bukit Chagar station, first follow the wayfinding along the covered bridge towards JB Sentral, then transfer to a bus, a taxi or the existing city pedestrian bridges. The walkway is about 450 metres. The time it takes differs from person to person, and after opening you have to walk it yourself. No project is listed, and a train that has not yet opened is not treated as an amenity you can already commute on. The passenger-service target follows the two countries’ joint announcement on the day.
If you are comparing new homes in Johor Bahru, start with the new property list for Johor Bahru.
Source
- Joint announcement by Malaysia’s Ministry of Transport and Singapore’s Land Transport Authority: RTS Link Service Commencement Targeted for February 2027 (October 2026; checked on 2026-11-13)
- Land Transport Authority of Singapore: Factsheet: Updates on the Johor Bahru – Singapore Rapid Transit System Link (January 2024: Bukit Chagar to Woodlands North, about 4 kilometres, the train about 5 minutes, clearance at the departure station; checked on 2026-11-13)
- CNA: RTS Link’s Bukit Chagar station to connect directly to KTM trains, buses and taxis: Malaysia Transport Minister (2026-08-18: a covered bridge of about 450 metres with a travelator connecting to JB Sentral; bus and taxi connections at Jalan Jim Quee, and connections to KOMTAR JBCC and JB Sentral, planned to be ready when operations start; the closer KTM connection then expected to take about twelve months; fares and the formal opening date to be jointly announced by both countries later; checked on 2026-11-13)
- Malaysia Ministry of Transport RTS project page and RTS Link official introduction (explanations of the stations and facilities such as ICQ; checked on 2026-11-13)
Related reading
- Crossing at the Tuas Second Link, and how to count the time separately from the Causeway