The RTS Link is a cross-border railway that has not yet opened. The Malaysian station is at Bukit Chagar in Johor Bahru, and the Singapore station is at Woodlands North. When you look at a home “nearby”, first check how far the official statements have now gone, then walk the route yourself from the unit door to the station.

Do not only listen to “close to the RTS means it is definitely better”, and do not treat the few minutes from station to station as your door-to-door time every day. If you cross the border every day, I would first look at the city centre, and preferably a unit from which you can walk to the checkpoint (CIQ, that is Bangunan Sultan Iskandar) or to Bukit Chagar station.

This site already has two related articles: one on Once the RTS is here, will Johor Bahru homes really get better?, and one on Working in Singapore, buying in Johor Bahru: work out the door-to-door commute first. Those two remain useful. This article does not forecast house prices, and does not discuss whether they will rise. It only sets out clearly the facts to check when you view a home.

First look at what the official statements now say

A joint announcement by the Ministry of Transport Malaysia and the Land Transport Authority of Singapore in October 2026 states: the operating company RTS Operations Pte Ltd (RTSO) has informed the grantors of both sides that passenger service is now targeted to start in February 2027. This revised timetable still has to wait for RTSO to obtain independent safety certification, and to obtain final regulatory approval.

The same announcement also states: infrastructure works on both sides are substantially complete; RTSO expects to finish the final system testing and trial runs by 31 December 2026, after which an independent safety assessor will certify them, and passenger service will only be approved after the authorities of both countries are satisfied with the review.

So a target is a target. It is not already in service, and it does not guarantee the day it will open. If an older project briefing still writes “opening at the end of 2026”, follow this updated joint announcement.

Look at the route, the journey time and the design capacity separately

According to the Land Transport Authority of Singapore’s explanation in January 2024, and the Ministry of Transport Malaysia’s introduction to the project:

On clearance, the January 2024 explanation states: the immigration facilities of Singapore and Malaysia are at the two stations, Woodlands North and Bukit Chagar. Passengers complete clearance for both sides at the departure end, and do not have to clear immigration again on arrival. At the Woodlands North end, you can transfer to the Thomson–East Coast Line (TEL) through an underground concourse. This is a design explanation from before opening. Queue times, opening hours and how you finally walk it after formal operations still have to follow the arrangements published by the authorities and the operator at the time.

Fares and train times, at the time of checking, had not yet been seen as confirmed figures in the official announcements above. Before there is an official publication, do not use a rumoured fare for a budget.

The words “close to the RTS” have to be checked by taking them apart

If the show gallery says “close to the station”, I would ask the client to change the question to these:

  1. What is marked on the map: the show gallery, the centre of the plot, or the residential entrance of your particular unit? These three points are often not the same place.
  2. From downstairs at the unit to the public entrance of the station, is there now a path that is already open and can be walked? A straight-line distance does not mean the road can be walked. Whether it is covered or uncovered, and whether you have to cross a road or a worksite, all have to be walked once yourself.
  3. If the station area is still being finished or a connection is still being built, will the entrance change after completion? Do not treat a temporary route you walk now as the fixed route later.
  4. In the evening, at the weekend, or when you have a lot of luggage, can you accept this route?

When you view a unit, do not only look at an advertisement that writes “near the RTS” or “a 5-minute walk”. Ask the other party to explain from which point to which point it is measured, then check yourself on Google Maps how many minutes the walk takes, which path it takes, and whether there is a covered walkway. It is best to pick a commuting time and actually walk it once. This site will not confirm a walking distance for any project. There is also no official list I can cite here of “which developments count as within walking range of the RTS”.

Even if crossing becomes more convenient, what should be checked on the unit still has to be checked

Being close to the station does not automatically cancel the foreign-buyer threshold, state-government approval, the advertising permit, or the conditions in the sale and purchase agreement. For what foreigners buying a home in Johor should check first, see Foreigners buying a new home in Johor: what to check first, as well as the articles on Foreigners buying a home in Malaysia: use Johor first to work out the full cost and Can foreigners buy landed homes, Bumi units and Malay reserve land in Johor?

When you view a home, I would also suggest asking at the same time:

What this article clearly does not write

It does not forecast whether house prices will rise after the RTS opens. It does not estimate a rental yield. It does not treat design capacity or a chamber-of-commerce research report as evidence that your particular unit will rise in value.

If what you care about is “will it get better”, see this site’s article on the RTS and Johor Bahru homes. It writes the optimistic statements and the worried statements separately, and in the end still comes back to your own price, supply, and whether the walk is convenient.

Can you now buy an RTS unit that is already in service, on which the commute can be measured in practice? No. The joint announcement writes a target of passenger service starting in February 2027, still subject to safety certification and final approval. What you buy now is a home from before opening. The commute can for now only follow the existing routes, and you should leave room for uncertainty after opening.

The above is general information, not investment advice. Opening times and operating details follow the more recent announcements of the authorities of both countries and the operator.

If you are comparing new homes in Johor Bahru, start with the new property list for Johor Bahru.